We build our homes up to 95% complete before they are transported to site. Once arrived, we work alongside local tradespeople to complete final on-site installations such as the PTAC unit, Pro-Lock roof system, and an optional deck and terrace.
Make sure to follow along for more behind-the-scenes looks at how we build #BisonStrong.